From 31c6d2496db01eea78c7374b3060c6944e75c260 Mon Sep 17 00:00:00 2001 From: BFE Engineering Date: Sun, 30 Aug 2026 22:20:16 -0600 Subject: [PATCH] docs: mark the NPU feasibility study as point-in-time context Its 'our boards' / 'this product' phrasing predates the repositioning (ADR-0008); a banner marks the context instead of rewriting a dated study. --- docs/npu-graphics-feasibility.md | 4 ++++ 1 file changed, 4 insertions(+) diff --git a/docs/npu-graphics-feasibility.md b/docs/npu-graphics-feasibility.md index 7dc2c1c..dd189dc 100644 --- a/docs/npu-graphics-feasibility.md +++ b/docs/npu-graphics-feasibility.md @@ -1,5 +1,9 @@ # NPU Graphics Feasibility +> Point-in-time engineering study, written while scoping the `rknpu.ko` 6.18 +> port for the downstream WardenOS firmware — "our boards" / "this product" +> below refer to that context. The hardware conclusions apply to any 86 Panel. + **Bottom line: no, not for 3D rendering — not "slower," but genuinely not how the hardware works past the first pipeline stage. The RKNPU on RV1106 is a fixed-function, INT8-only, command-stream tensor accelerator with no rasterizer,